Project

Derive, Alexandria

Derive, Alexandria

Date

May 2018

Location

71-91 Euston Road, Alexandria

Service

Structural Engineering

The project, known as Derive, Alexandria, covers an area of approximately of a 1,450m2 originally consisted of a tyre and mechanical workshop. The works comprised the demolition of the existing structures; and construction of a five-storey mixed-use residential building overlying a two-level basement.

Prior to the commencement of construction, EI Australia was initially engaged to provide a number of environmental engineering solutions including preparation of an Acid Sulfate Soil Management Plan, a Remediation Action Plan and a Construction Environmental Management Plan. In addition to this, EI Australia was requested to assist with Site Validation & Waste Classification, Hazardous Materials Survey and Hazardous Materials Clearance Certificate, provision of Asbestos in Soil Removal Plan, conduct Dewatering Testing and prepare a Dewatering Management Plan. In addition, our Geotechnical Engineering team was called in to undertake a Geotechnical Investigation.

At the same time EI Australia’s Structural Engineering team were engaged by the builders to prepare all structural design documentation for the project.

Construction site
EI Australia on site in Alexandria

This involved all aspects of the structural design process including;

The EI Australia structural design team Autodesk Revit, CAD, Navisworks, Rapt, RC Buildings and RAM Concept technologies in the execution of this project.

Geotechnical Engineering

Deicorp Rockdale

Geotechnical Engineering

Dedico Haymarket

Environmental Engineering

Industrial Site Declared as Significantly Contaminated Land under CLM Act